Post #46 Working On CCR's
First, I will start off by saying that coming up with idea's for CCR's was more difficult than I had thought. However, the more I started production for them, the more ideas I achieved. This means that in my process of building my reflection, I came up with more creative ideas to reflect.
Second, I had a few original ideas that I wanted to export. Although, these ended up not working out for numerous reasons. One of the ideas was to have a "Draw-My-CCR". This refers to the youtube videos labeled "Draw-My-Life", where one has a camera facing the top of a table, drawing on a white board, and doing a voice-over of what they are drawing. Usually, the people who create these videos speed it up so that the viewers are caught up with what the voice is explaining.
This idea did not work out because I did not have a white board on hand. I also did not own a phone stand to watch my drawing. The idea would be that I answer the question about how I integrated technology into my final cut and draw out what I was explaining.
During the production of my CCR's, I made a lot of mistakes. This ranges from stuttering to my phone dying mid-film. Nevertheless, I still had fun and laughed at my bloopers with the friends that were featured.
Lastly, another idea that I came up with while also figuring some out for my friend Olivia Pridgen, was a walk-and-talk CCR. Here, one would be walking anywhere such as a park or their neighborhood while explaining and answering one of the CCR questions. The reason I did not take this idea was because I had already come up with ideas for the rest of my CCR's.

Comments
Post a Comment